MASTER REPORTERS GLOBAL NEWS
Bringing to you Breaking news from around the globe.
Mr Rotimi Amaechi, The Minister of Transportation said the federal government has approved the sum of 3.9 billion dollars for the construction Warri seaport and also awarded contract for Abuja-Warri rail line.
The Minister of Transportation, Mr Rotimi Amaechi [TheSightNews]
The minister according to NAN, on Tuesday, May 7, 2019 also claimed that the federal government had approved the linking of Abuja to Itakpe, Itakpe-Warri, then from Warri rail to the seaport.
“The President awarded the contract for Abuja to Warri, Abuja to Itakpe, then to Warri. From Warri rail to the seaport. We are building a new seaport in Warri, the cabinet approved it last week, that is about 3.9 billion dollars,” he said.
President Muhammadu Buhari takes a train ride with the Minister of Transport, Rotimi Amaechi and the Minsiter of state for Aviation, Hadi Sarika. (Dailytrust)
However, Ameachi said that about 45 billion dollars was needed to complete rail development projects in the country and the government has so far spent less than 3 billion dollars on all the ongoing projects.
“The Lagos-Ibadan will cost about 1.6 billion dollars, that doesn’t include the extra cost of things we didn’t prepare for or see in the evaluation; Abuja-Kaduna was constructed with about a billion dollars.
“We also paid 500 million dollars to buy locomotives and rolling stocks for Lagos-Ibadan, I can’t remember how much we spent buying rolling stocks for Kaduna-Abuja, that is what we have spent so far.
“So all the noise that you hear people saying we have spent 8 point something billion dollars is not true. I don’t think we have spent up to three billion dollars so far. Railway is capital intensive, a trillion naira is about 2.7 billion dollars.
Transport Minister, Rotimi Amaechi, queries contractors on slow pace of the construction of Train Stations at the Itakpe-Ajaokuta-Warri rail line. (Sunnews)
“And that is for 200km of railway, if you plan to do Lagos-Ibadan and you are looking at 8.7billion dollars that is between 3 and 4 trillion Naira. That is why I said we will need about 35 to 45 billion dollars.
“To be able to do Lagos-Kano, Port harcourt-Maduguri, Lagos-Calabar and Abuja-Warri, once we do this four tracks, we have covered the country and we have solved the problems of transportation to a great extend.”
Amaechi said that once Lagos-Kano, Abuja-Warri, Port Harcourt-Maduguri, Lagos-Calabar rail lines are constructed, the rail would have covered the country.
By SEUN ADEYEYE
Share this
Copyright © 2019 Master Reporters all rights Reserved.
0 comments: